Sunday/ Amazon construction update

The city of Seattle had a decent Sunday (with sun!), and I used the opportunity to go check out the progress on the Amazon biospheres.   There is also a third Amazon tower building for which construction had started in the fall of 2016, with its completion scheduled for some time in 2018.

The three biospheres all have complete outer shells, but there is still work needed on the inside. What must surely be the city’s smallest dog park, is in the lower right of the picture : an enclosure barely bigger than my sitting room. Just behind the white containers on the left of the picture, is the foundation of Amazon Tower III, slated for completion in 2018.
Here is an artistic rendering of the three Amazon Towers. From left to right : Amazon I is the set of buildings with the red & green; Amazon II is the blue one to the right of the biospheres, and Tower III is the one on the far right, still under construction (37 floors). © Magnusson Klemencic Associates
This is the view on the north-facing side of Amazon II. There is an Amazon Go grocery concept store* on the far corner (where the yellow paneling ends) – but the store is not yet open to the public. *There are no check-out lines. The store uses technology to detect when a shopper takes an item from the shelf, and then syncs the data to the shopper’s smart phone.

Leave a Reply

Your email address will not be published. Required fields are marked *