Monday/ First Light’s art installation

Here is another picture from Sunday, of the art installation on the corner of 3rd Ave. and Virginia St. at the sales office of the future First Light condominium tower.

The artwork is a demonstration of the ‘curtain’ of cords and discs that will be installed around the lower floors of the First Light condominium building. The condo tower is only slated to open in the summer of 2022, though. A sign nearby says 60% of the units have been sold to date.

Leave a Reply

Your email address will not be published. Required fields are marked *